Skip to content

Reference

12 V and USB-C Outlets for RV and Boat Builders: UL 2089, SAE J2611, USB PD Wattage, Cutout Sizes, Fusing and Where to Place Them in Production

For RV, van and boat production: the standards that apply to 12 V accessory sockets and USB chargers, what USB-C PD wattage buyers now expect, the cutout and depth for round and rectangular outlets, how to fuse and wire a run of them, and the placement checklist that avoids warranty calls.

Starlink Mini Battery Runtime: Watt-Hours Per Hour, Overnight Amp-Hours From 12 V, Battery Bank Sizing and Solar Recharge for RV, Van and Off-Grid

How much a Starlink Mini actually draws in each state, how to turn that into amp-hours from a 12 V bank, runtime from portable packs and house banks of every common size, the inverter penalty, and how much solar it takes to run the dish indefinitely.

MC4 vs MC4 Evo2 vs Amphenol H4 vs Tyco Solarlok vs Renogy: PV Connector Compatibility, Intermateability Listings and How to Identify What Is on Your Module

The PV connector families in the field, which ones are actually listed to mate with which, how to tell them apart by sight and by marking, what NEC 690.33(C) requires, and what to do when a module ships with a connector that does not match the rest of the array.

Wire Ampacity Chart: NEC Table 310.16 Copper and Aluminum at 60, 75 and 90 C, Termination Rules, Temperature Correction and Bundling Derating

NEC Table 310.16 ampacities for THHN, THWN, XHHW and USE from 14 AWG to 1000 kcmil in copper and aluminum, why the 75 C column is the one that usually governs, the small-conductor cap in 240.4(D), the ambient correction and conductor-count adjustment factors, and how the lug's temperature rating ties the whole thing together.

RV 12 V Electrical Panel Wiring: Fuse and Wire Size by Circuit, Battery Disconnects, Busbars, ANL and Class T Fuses, and the ABYC E-11 Rules That Apply on the Road

How to wire a 12 V DC system in an RV, van or boat that passes an RVIA or ABYC inspection: main fuse type by battery chemistry, wire gauge by amps and length at 3 percent drop, branch fuse sizes for the common loads, busbar and disconnect placement, and the 7 in rule.

PoE Power Budget and Cable Length: 802.3af, at, bt Power per Port, Voltage Drop on Cat5e, Cat6 and Cat6A, and Why CCA Fails on PoE

How much power reaches the device at the end of a PoE run: the four PoE classes and their watts at the switch and at the load, the pairs and current involved, the 100 m limit and what happens past it, the derating for bundles under NEC 725.144, and the resistance numbers that make copper-clad aluminum cable a PoE failure.

DIN Rail Terminal Blocks vs Power Distribution Blocks vs Busbar: Which One Belongs in a Control Panel, With UL 1059, UL 1953 and UL 508A Spacing Rules

For UL 508A panel builders and anyone wiring a control enclosure: the three ways to split power and land field wiring, what each is listed to, the current and wire-size ranges, the spacing and bonding rules, and a selection table by function.

EMT Bending Guide: Take-Up and Gain for 1/2, 3/4 and 1 in Benders, 90s, Offsets, Saddles, Kicks, Multiplier Table and the NEC 358.26 Bend Limit

The numbers a hand bender needs: take-up and gain by bender size, the offset multiplier and shrink table, three- and four-point saddle math, back-to-back and kick bends, the 360 degree rule between pull points, and the mistakes that put a bend in the wrong place.

HDMI Cable Length Limits: How Far 4K 60 Hz, 4K 120 Hz and 8K Signals Run on Copper, Active, Fiber AOC and Extenders, HDMI 2.0 vs 2.1, and In-Wall Ratings

The real distance limits for HDMI at each resolution and refresh rate, why the numbers fall as bandwidth rises, when to move from passive copper to active copper, fiber active optical cable or an HDBaseT extender, what the certification labels mean, and the CL2 and CL3 rules for cable inside walls.

Extension Cord Gauge Chart: Amperage and Wattage by Wire Gauge and Length, Voltage Drop, SJTW vs SJEOW vs STW, and OSHA Rules for Job Sites

Which gauge extension cord carries a given load over a given distance without overheating or starving the tool, with the amp and watt ratings by gauge, voltage drop at 25 to 200 ft, the jacket letters decoded, and the OSHA 1926.405 and NFPA 70E rules for cords on construction sites.

PV String Sizing at Record Low Temperature: Voc Correction, Maximum Modules per String for 600 V, 1000 V and 1500 V, and NEC 690.7

How to calculate the maximum number of modules in a PV string so cold-morning open-circuit voltage never exceeds the inverter, connector and conductor rating: the temperature coefficient method, the NEC Table 690.7(A) method, worked examples at 600, 1000 and 1500 V, and where to find record low temperature.

How Many Ground Rods Do You Need? NEC 250.53 Two-Rod Rule, the 25 Ohm Test, Soil Resistivity and Rod Spacing, Length and Diameter

When one rod is enough, when the NEC requires two, why almost every inspector now requires two without a test, how soil resistivity sets electrode resistance, and how rod length, diameter and spacing change the result, with the formula and a table.
Back to top