Skip to content

Technical Resources

NEC 2026 Grounding and Bonding Changes: What Electricians Need to Order Differently

The 2026 NEC cycle tightens irreversible compression requirements, GEC sizing tables and bonding of metal water piping. Here is what changed in Article 250 and which parts to stock before your AHJ adopts it.

Rigid vs EMT Couplings: Threaded, Set-Screw, and Compression — Which Coupling for Which Raceway

EMT set-screw, EMT compression, rigid threaded, and rigid threadless compression couplings: what each joins, why EMT and rigid fittings never interchange (different ODs), and the NEC 344.42 / 358.42 bonding rules.

EMT Support Spacing and Fastening: NEC 358.30, Straps, Hangers, and Strut Clamps

NEC 358.30 EMT support spacing (3 ft from boxes, 10 ft intervals, the two exceptions), rigid/IMC intervals by size, and how to choose between one-hole straps, two-hole straps, conduit hangers, and strut clamps.

EMT Fittings Guide: Set-Screw vs Compression vs Raintight, and What NEC 358 Requires

Set-screw vs compression vs raintight EMT fittings: how each grips, what UL 514B, concrete-tight and raintight mean, and the NEC 358.42, 358.10, 300.4(G) and 250.97 rules that decide which fitting you can use.

Battery Cable Lug Sizing Guide: Inverter Wattage to Cable Gauge, Crimp vs Solder, and ABYC Rules

How to size battery cable lugs from inverter wattage and cable gauge, bare vs tinned, why ABYC prohibits solder-only connections, torque values by stud size, and the crosses to Quick Cable, Burndy, Panduit, and Del City.

90°, 45°, and Straight Compression Lugs — When to Bend the Barrel

When to specify a 90° flag lug, a 45° lug, or a straight compression lug: NEC 312.6 bending space, cable bend radius, where each bend is used, and how bent lugs are crimped and torqued.

DC Power Distribution for 12 V, 24 V and 48 V Systems: Busbars, Fuse Blocks, and the ABYC E-11 Rules

How to size busbars, choose the right fuse family (ATO, MIDI, MEGA, ANL, MRBF, Class T), and wire barrier terminal strips for 12 V, 24 V, and 48 V systems — with the ABYC E-11 rules on terminals per stud and the seven-inch fuse rule.

Grounding Accessories and the NEC: Bushings, Pigtails, Bonding Jumpers, and Rebar Clamps

Insulated grounding bushings, pigtails and grounding screws, water heater bonding kits, braided jumpers, and rebar clamps — what each one does and the NEC section (250.97, 250.146, 250.148, 250.8, 250.104, 250.98, 250.52) that requires it.

Split Bolt Cross-Reference Chart: Burndy KS, ILSCO IK, Blackburn H, NSI N-Series

Verified cross-reference chart for copper split bolt connectors: Conversions Tech 610-series to Burndy SERVIT KS, ILSCO IK/IK-N, Blackburn Type H, and NSI N-series, with equal-range, min-tap, and torque.

Split Bolt Connectors: Sizing, Torque, Taping, and Where the NEC Won’t Let You Use One

How to size, torque, and insulate copper split bolt connectors, what the equal-range and minimum-tap figures mean, and the NEC rules that decide where a split bolt is and is not permitted.

How to Crimp Irreversible Compression Grounding Connectors (C-Taps, Figure 6, Figure 8)

Step-by-step field procedure for crimping UL 467 irreversible compression grounding connectors: tool and die selection, conductor prep, crimp sequence, and the inspection marks that prove the joint.

Irreversible Compression Grounding Connectors: Where, How, and Why to Use Them

A working guide to irreversible compression grounding: what the NEC and UL 467 actually require, where compression beats exothermic welding and mechanical clamps, and how C-taps, Figure 6, and Figure 8 connectors are specified.
Back to top